Turn a start date into a ramp that ends in quota.

“How do I get a new rep from start date to quota without guessing?”

A 30/60/90 with milestones, a certification bar before full load, and the manager touchpoints that catch a slow ramp early.

CLOSE MORE DEALSINTERMEDIATECRM✓ APPROVED 4/4
EXAMPLE PROMPTS
>Build a 30/60/90 ramp plan for a new AE starting [date]
>What certification bar should they clear before carrying a full book?
>Where should manager touchpoints catch a slow ramp in week three, not month three?
ABOUT THIS SKILL

What this skill does

Takes a new hire and builds the ramp: a 30/60/90 plan where each gate has milestones the rep must hit, a certification bar they clear before they carry a full book, and the manager touchpoints that surface a slow ramp in week three instead of month three. It turns "figure it out" into a path with checkpoints, so a struggling rep is caught early and a strong one is turned loose sooner.

Inputs

  • Works today with: the role, the motion, the start date, and what "fully ramped" means for this seat. Paste it or describe it.
  • More powerful connected to a CRM: it tracks the rep's real activity and pipeline against the milestones, so ramp is measured, not assumed.
  • Sharper with a meeting or call tool: it can check discovery and demo reps against the certification bar with real calls.
  • Sharper with an LMS or content tool: it can map the learning path to your existing modules instead of generic ones.

How it works

  1. 1
    30/60/90 with a theme per gate

    Each gate has one job. Day 30 is learn: product, ICP, pitch, tools. Day 60 is do-with-support: real activity under supervision, first live calls, shadow-to-solo. Day 90 is own: full load, self-sourced, forecasting their own deals. One theme per gate keeps the ramp from becoming a firehose.

  2. 2
    Milestones at each gate

    Each gate carries 3 to 5 milestones written as observable results, not attendance. "Passed the pitch cert," not "watched the pitch training." "Sourced first 5 qualified meetings," not "did some prospecting." A milestone you cannot observe is not a milestone.

  3. 3
    The certification bar

    Before the rep carries a full book, they clear the CERT_BAR: a live pass on the pitch, a discovery call, a demo, and objection handling, graded against a rubric by the manager or a peer. The bar is pass or not-yet, and not-yet means more reps, not a lower bar. This is the gate that protects your pipeline from an unready rep.

  4. 4
    Manager touchpoints

    The plan schedules the manager's check-ins at TOUCHPOINT_CADENCE, front-loaded because week one is where a bad ramp starts. Each touchpoint has a purpose: unblock, coach, or assess against the nearest milestone. The point is to catch a slow ramp while there is still time to fix it.

  5. 5
    Early-warning signals

    The plan names the signals that a ramp is slipping: milestone missed at a gate, activity below the expected curve, cert not passed on the first attempt. Each has a response, so a slow start triggers coaching instead of a surprise at day 90.

Output format

ENABLEMENT PLAN · Mid-Market AE · outbound motion
Fully ramped = full quota, self-sourcing, forecasting own deals

DAY 30 · LEARN
  [ ] Pitch cert passed (live, rubric-graded)
  [ ] ICP + qualification framework quiz passed
  [ ] Tools and CRM hygiene checklist signed off
DAY 60 · DO WITH SUPPORT
  [ ] 15 self-sourced qualified meetings booked
  [ ] Discovery cert passed
  [ ] First 3 opps created, manager co-piloting
DAY 90 · OWN
  [ ] Demo + objection cert passed -> solo on deals
  [ ] Pipeline at 2x ramp-quota, self-sourced
  [ ] Forecasting own deals in the weekly call

Manager touchpoints: daily wk1, 2x/wk wks 2-6, weekly after.
Early warnings:
  - Pitch cert not passed by day 30 -> extra reps, re-cert day 37
  - Under 8 meetings by day 45 -> prospecting coaching block

Tips

  • Every milestone is an observable result, never attendance or "completed training."
  • The certification bar is pass or not-yet, graded against a rubric, before full load.
  • Manager touchpoints are front-loaded, each with a purpose, not just a recurring invite.
  • Every gate has an early-warning signal with a defined response.
  • FULLY_RAMPED is defined for the specific motion, not borrowed from another seat.
RELATED SKILLS
ALL CLOSE MORE DEALS SKILLS →